Allan's Blog

Change to blog format

Change is always tough, but sometimes the gain made by the change far surpasses the pain .  This may be one of those times.  Since this blog was meant to be a learning opportunity as well as a means to inflict my views and musings on anyone that cares to listen.  The first change will be a  to the format.  The blog content will be devided into a teaser and body.

Unexpected colour shift

I noticed a very significant colour shift in a few of my photos after I uploaded photos to my drupal photo gallery.   Since I have upgraded many of the image related modules over the last few months and also switched to Adobe Lightroom 3, it wasn't initially apparent what was causing the colour shift.

Phototips.biz

Found a great website on photography.
http://phototips.biz

Good content, great podcasts, interesting photo contests and a forum.
What more could you ask for!

My favourite photo model

Abby, My favourite photo model came to stay for the weekend.  Here are some of the photos.

Al sees the light

Jo mentioned that she wanted me to take down the plastic diffuser for the fluorescent light fixture in the hallway so that she could clean it..  Sounds easy right?

AV Cabinet

I decided that a built-in A/V cabinet would be a good idea for the basement family room.  The cabinet is 20" W x 40"H x 24"D.  The cabinet is made from 3/4" MDF with all joints glued, screwed and aligned with biscuits.  The upper and lower shelves can be adjusted up or down in 1" increments.

New roof

The roofing contractor finished the roof today.  I think the new colour works well.

Office Renovations - Cont. 5

Flooring installation started today.


May 18
Laminate flooring has been completed.


May 26
Baseboards are being installed.

Office Renovations - Cont. 4

Cutting, painting and installation of the ceiling tiles continues...


May 14
Painting and installation of ceiling tiles is complete.  The "runners" that run the length of the room and hide the gap between the tiles will be installed at the end of the project.

Office Renovations - Cont. 3

The drywall taping is now complete, the drywall primer/sealer has been applied and the first coat of colour has been applied.


May 3
The second and final coat of paint has been applied,  The ceiling grid has been installed in the closet and the ceiling tiles have been cut and temporarily installed.  The ceiling tiles will be removed for painting and to have the pot lights installed.  The installeation of the grid in the office has started.


May 4
The main field of the ceiling grid in the office has been installed.